• The project consists of an administration building and paper factory in Ain Sokhna – Suez. Built on a lot of land of 164,000 sq m. The administration building is 2 story high on a built-up area of 1000 sq m. Besides the construction works, the building was equipped with iron doors -fire proof- as well as fire alarms, ventilation and cooling systems.

  • Category: CRC - Egypt - Factories
  • Date: 15 Jan 2020